Hurricane Renovation Projects include:

The Breakers of Fort Walton Beach
Sliding Glass Door Replacement

Activities Included:  Installation of 265 new sliding glass doors in a six story, 184 unit, two building residential condominium complex.  The sliding glass doors were commercial series EFCO doors and included the full waterproofing of the door perimeter. 

 

November 2006 – July 2007.  Total installation labor cost $388,000, total project cost $2,000,000.

 


Commodore’s Landing Owner’s Association, 
Hurricane Ivan Repairs.

Activities Included:  Full interior and exterior renovation of a 54 unit, 5 building residential condominium complex.  Activities included:  remove and replace all exterior side walls including removal of all sheating, replacing any damaged studs, replace with new sheathing and three part conventional stucco.  All interior drywall damage was removed and replaced with new drywall, textured and painted.  All door openings that were damaged were either repaired or demolished and replaced with new studs and headers.  All missing and damaged fascia and soffit was removed and replaced with new materials to match existing.  Any electrical, plumbing or HVAC systems that were damaged from the hurricane were repaired or replaced.

 

January 2006 – September 2006, Total cost $272,642

 

 

Hunnicutt Insurance, 
Hurricane Ivan Repairs. 

Activites Included:  Full demolition of the existing interior office space.  All new metal stud walls to accommodate offices, reception area, conference room, bathrooms etc….  All new sheetrock, texture, paint, tile laid on a diagonal throughout, acoustical ceiling (including all new track).  All new electrical, plumbing and HVAC systems.

 

September 2005 – December 2005.  Total cost $60,000.

 


 

Garvie GLC Contracting Inc.
Centrally located in downtown Fort Walton Beach

315 Shell Avenue SE 
Fort Walton Beach, Florida 32548
Phone: (850) 243-5554
Fax: (850) 243-2612

Copyright 2007, Garvie GLC Contracting Inc.  All rights reserved