Jan 2003 – March 2004

Owner – Miramar Enterprises of FWB, Inc. (Susan Myers), (850) 244-4428
Construct a three story,40’ tall, 12,000 SF commercial building. First floor has 16’ ceilings. Contract Amount: $1,127,986
Notable activities include:
· Demolition of two existing one story buildings
· Install Block for the first and second floor walls
· Frame third floor with structural light gauge metal studs
· Hambro concrete floor system
· Structural steel to support the Hambro system.
· Metal staircase and aluminum handrails
· Sprinkler and fire alarm systems
· Commercial kitchen with hood suppression system
· Commercial elevator
· James Hardi fiber cement siding
· Construct asphalt parking lot and retention ponds
· Install 1500 gallon grease trap for kitchen
· Two handicap accessible bathrooms per floor


|